EBB Retrofit Preparation & Guide
For Homeowners Working with Avant-Garde Construction Enterprise
Licensed • Bonded • Insured | Serving the Entire San Francisco Bay Area
🛠️ 1. Preparing for Your Consultation
Before your consultation with Avant-Garde, we recommend:
-
Gather Documents: Locate any original building plans, engineering reports, or past retrofit documentation.
-
Take Photos: Photograph your crawl space, foundation edges, any visible cracks, and areas of concern.
-
Clear Access: Ensure easy access to the crawl space and foundation—remove stored items or debris.
-
List Concerns: Write down any structural issues you’ve noticed (e.g., uneven floors, moisture, odors).
📋 2. Questions to Ask All Contractors
Ask these questions while selecting which contractor will be trusted to protect your home and family:
Technical
-
What is the current condition of my crawl space and foundation?
If the response if short and vague, beware. -
Will you use structural screws or nails — and why?
There is a huge disparity between the two. -
How do you deal with tight crawl spaces, wiring, plumbing, or HVAC obstructions?
Look for well defined answers. -
What are your recommended upgrades beyond the required work, if any?
If there are none, avoid at all costs. -
Why do you seismic retrofit homes, and when did you start?
If it is only to participate in the work provided from the EBB program, they are probably not a real seismic retrofit expert. -
What other services do you provide?
If seismic retrofit work is not their main service, you may want to reconsider choosing them.
EBB Program & Compliance
-
Will this retrofit qualify for the Earthquake Brace + Bolt program?
-
Do you help with the EBB documentation and photo uploads?
-
Can I see examples of previous compliant EBB projects you’ve completed?
Timeline & Logistics
-
What’s the estimated start date and how long will the job take?
-
Will I lose access to utilities during any part of the work?
-
Do I need to vacate or modify anything inside my home?
Quality & Assurance
-
How do you ensure my systems (electrical, plumbing, HVAC) won’t be damaged?
-
Do you provide before & after photos for transparency?
-
What warranties or post-retrofit support do you offer?
- What quality control practices do you have in place?
📑 3. Permits, EBB Reimbursement & What to Expect
Permits
-
Required for any retrofit — Avant-Garde handles permitting, plan submission, and inspections.
EBB Reimbursement
-
You may qualify for a $3,000- $10,000 grant if accepted into the EBB Program.
-
Requirements:
-
Use an EBB-registered contractor (Avant-Garde qualifies)
-
Complete the retrofit and pass city inspection
-
Submit signed contract, photos, permit, and final inspection approval online
-
What to Expect During the Retrofit
-
Expect:
-
Dust (controlled), noise, and limited crawl space access for a few days
-
Most EBB retrofits take 1–5 working days
-
Professional site protection and daily cleanup from Avant-Garde’s team
-
✅ 4. Post-Retrofit Inspection Guide
Once the job is done, make sure:
-
Bolts are installed properly, per plan
-
Shear walls (plywood bracing) are securely and neatly fastened (if your home has cripple walls)
-
Plumbing, electrical, and HVAC are undisturbed
-
Crawl space is safe and clean
-
All construction debris is removed
-
A final inspection is passed and signed off by the city
🔒 You Will Receive:
-
📷 Before & After Project Photos
-
🧾 Final Invoice
-
📝 Permit Copies & Approved Drawings
-
📂 EBB Documentation Packet (Avant-Garde assists with this)
🧠 Questions? Need Help?
Avant-Garde Construction Enterprise is with you every step of the way.
Contact Matthew Gatterman directly if you need guidance before or after your retrofit.




